|
|
| MOQ: | 1 torba |
| Cena £: | Negocjowalne |
| standardowe opakowanie: | 25 kg na worek, 60 worków na palecie/torbie jumbo |
| Okres dostawy: | 2-5 dni roboczych |
| metoda płatności: | L/C, T/T |
| Wydajność dostaw: | 50 ton dziennie |
| Item | Thermoplastic road marking paint |
|---|---|
| Appearance | Powder |
| Color | White, Yellow, and other options |
| Main material | C5 petroleum resin |
| Construction temperature | 180-220℃ |
| Dry speed | Within 3 minutes |
| Coverage rate | 1 ton covers over 200㎡ |
| Package | 25kg per bag |
|
|
| MOQ: | 1 torba |
| Cena £: | Negocjowalne |
| standardowe opakowanie: | 25 kg na worek, 60 worków na palecie/torbie jumbo |
| Okres dostawy: | 2-5 dni roboczych |
| metoda płatności: | L/C, T/T |
| Wydajność dostaw: | 50 ton dziennie |
| Item | Thermoplastic road marking paint |
|---|---|
| Appearance | Powder |
| Color | White, Yellow, and other options |
| Main material | C5 petroleum resin |
| Construction temperature | 180-220℃ |
| Dry speed | Within 3 minutes |
| Coverage rate | 1 ton covers over 200㎡ |
| Package | 25kg per bag |