|
|
| MOQ: | 1 torba |
| Cena £: | Negocjowalne |
| standardowe opakowanie: | 25 kg na worek, 60 worków na palecie/torbie jumbo |
| Okres dostawy: | 2-5 dni roboczych |
| metoda płatności: | L/C, T/T |
| Wydajność dostaw: | 50 ton dziennie |
Applying thermoplastic road marking paint involves heating the material to a temperature between 180°C and 220°C using a preheater. Once melted, the paint is transferred to a road marking machine and applied directly to the road surface. During application, glass beads are usually dropped onto the hot paint to enhance reflectivity. The paint cools and hardens within minutes, creating a durable, high-visibility line. Proper surface cleaning and temperature control are essential to ensure strong adhesion and long-term performance.
| Item | Thermoplastic road marking paint |
|---|---|
| Appearance | Powder |
| Color | White, Yellow, and other options |
| Main material | C5 petroleum resin |
| Construction temperature | 180-220℃ |
| Dry speed | Within 3 minutes |
| Coverage rate | 1 ton covers over 200㎡ |
| Package | 25kg per bag |
We support OEM, including customized packaging and private labeling. We can also tailor the formulation of our road marking paint to meet specific standards.
|
|
| MOQ: | 1 torba |
| Cena £: | Negocjowalne |
| standardowe opakowanie: | 25 kg na worek, 60 worków na palecie/torbie jumbo |
| Okres dostawy: | 2-5 dni roboczych |
| metoda płatności: | L/C, T/T |
| Wydajność dostaw: | 50 ton dziennie |
Applying thermoplastic road marking paint involves heating the material to a temperature between 180°C and 220°C using a preheater. Once melted, the paint is transferred to a road marking machine and applied directly to the road surface. During application, glass beads are usually dropped onto the hot paint to enhance reflectivity. The paint cools and hardens within minutes, creating a durable, high-visibility line. Proper surface cleaning and temperature control are essential to ensure strong adhesion and long-term performance.
| Item | Thermoplastic road marking paint |
|---|---|
| Appearance | Powder |
| Color | White, Yellow, and other options |
| Main material | C5 petroleum resin |
| Construction temperature | 180-220℃ |
| Dry speed | Within 3 minutes |
| Coverage rate | 1 ton covers over 200㎡ |
| Package | 25kg per bag |
We support OEM, including customized packaging and private labeling. We can also tailor the formulation of our road marking paint to meet specific standards.